Our process

How a DOTT project actually runs

Seven stages, defined deliverables at each one, and a written record of every decision. This is the process that produces a 96% on-time handover rate.

At a glance

Brief to keys, mapped

Hover or tap any stage for its typical duration.

Brief — 45 min Brief 45 min 1Survey — Day 2–4 Survey Day 2–4 2Concept — Week 1–2 Concept Week 1–2 33D views — Week 2–3 3D views Week 2–3 4Drawings & BOQ — Week 3–4 Drawings & BOQ Week 3–4 5Execution — Week 4+ Execution Week 4+ 6Handover — Final week Handover Final week 7two free revision rounds feed back into concept
Stage by stage

What happens, when, and who does it

Every stage has a defined output. You always know what you're waiting for and roughly how long it takes.

Where the weeks go

1,050 sq.ft turnkey, signature package

Design & drawings3 wk
Civil & ceiling2 wk
Joinery production3.5 wk
Installation1.8 wk
Painting & finishes1.4 wk
Styling & snagging0.8 wk
  1. 01

    Discovery call & brief

    We listen first: how you use the space, who lives in it, what irritates you about it today, and what the budget genuinely is. You leave with a realistic cost band before spending a rupee.

    45 minutes
  2. 02

    Site survey & measurement

    Laser measurement of every wall, beam, sill, shaft and service point. We record slab levels, plumbing lines and electrical loads — the data that stops surprises later.

    Day 2–4
  3. 03

    Concept, zoning & mood board

    Two or three layout options with a material and colour direction for each. We debate the plan before anyone falls in love with a render.

    Week 1–2
  4. 04

    3D visualisation

    Photoreal views of every room so you sign off on the actual look. Two revision rounds are included as standard, and we keep going until it's right.

    Week 2–3
  5. 05

    Working drawings & BOQ

    The build-ready set: plans, elevations, joinery details, ceiling and electrical layouts, and an itemised BOQ naming every brand and rate. Sign this and your price is locked.

    Week 3–4
  6. 06

    Execution & quality control

    A dedicated supervisor on site, weekly written progress reports with photos, and three formal quality inspections — after civil, after joinery installation and before painting.

    Week 4 onward
  7. 07

    Handover, snagging & warranty

    Deep clean, styling, a joint snag walk, all warranty documents and appliance manuals handed over, and a 60-day check-in call. Then a 10-year carcass warranty stands behind the joinery.

    Final week
Deliverables

Exactly what lands in your inbox

No vague “design work”. Each stage produces documents you own and can build from, with us or without us.

Concept stage

  • Two or three layout options
  • Zoning & circulation diagram
  • Material and colour direction board
  • Indicative budget band

Design stage

  • Photoreal 3D of every room
  • Two revision rounds included
  • Finish and hardware schedule
  • Furniture and lighting selection

Documentation stage

  • Dimensioned floor plans
  • Wall elevations for every room
  • Joinery details & section drawings
  • Ceiling, electrical & plumbing layouts
  • Itemised BOQ with brands and rates

Execution stage

  • Weekly written progress report with photos
  • Three formal quality inspections
  • Written variation orders for any change
  • Material approval samples on site

Handover stage

  • Joint snag walk & closure
  • Deep clean and styling
  • Warranty documents & manuals
  • As-built drawing set
  • 60-day check-in call
Payments

A schedule tied to progress, not to the calendar

You never pay for work that hasn't happened. Each release is triggered by a milestone you can see on site or in your inbox.

Design sign-off10%
Material procurement40%
50% site progress30%
Before handover15%
After snag closure5%

Bank transfer, UPI or cheque. 0% consumer EMI available on selected brands. Model your monthly outflow →

Quality control

Three inspections, one snag list

  • QC1 — after civil & ceiling. Levels, plumb, waterproofing test, conduit routing and beam clearances checked against the drawing before anything is closed up.
  • QC2 — after joinery installation. Shutter alignment, hinge and channel ratings, edge sealing, gap tolerances and hardware operation on every unit.
  • QC3 — before painting & handover. Surface preparation, socket and switch positions against the electrical layout, and a full function test of every fitting.

On-time handover

Snags closed in 7 days

Process questions

What clients ask at kickoff

How many design revisions do I get?

Two full revision rounds are included at 3D stage as standard, and in practice we keep refining until you are happy — we have never charged a client for a third round. Changes requested after the BOQ is signed are issued as written variation orders so cost impact is visible before work proceeds.

What happens if something goes wrong on site?

It gets reported to you in the weekly report, not discovered at handover. If a material fails inspection it is replaced at our cost. If a site condition forces a design change — a hidden beam, an unexpected shaft — we bring you two solutions and a cost comparison within 48 hours.

Can I live in the house during the work?

For renovations, usually yes. We phase the programme so at least one bedroom and one bathroom stay usable, seal off active zones with dust barriers, and schedule the loudest work into agreed windows. Full turnkey fit-outs go faster in a vacant flat, so we will tell you honestly which makes more sense for your project.

Let's design something you'll still love in 2036.

Share your floor plan and budget. Within 48 hours you'll have a written scope, an indicative BOQ and a realistic timeline — no obligation, no sales pressure.