Concept stage
- Two or three layout options
- Zoning & circulation diagram
- Material and colour direction board
- Indicative budget band
Seven stages, defined deliverables at each one, and a written record of every decision. This is the process that produces a 96% on-time handover rate.
Hover or tap any stage for its typical duration.
Every stage has a defined output. You always know what you're waiting for and roughly how long it takes.
1,050 sq.ft turnkey, signature package
We listen first: how you use the space, who lives in it, what irritates you about it today, and what the budget genuinely is. You leave with a realistic cost band before spending a rupee.
Laser measurement of every wall, beam, sill, shaft and service point. We record slab levels, plumbing lines and electrical loads — the data that stops surprises later.
Two or three layout options with a material and colour direction for each. We debate the plan before anyone falls in love with a render.
Photoreal views of every room so you sign off on the actual look. Two revision rounds are included as standard, and we keep going until it's right.
The build-ready set: plans, elevations, joinery details, ceiling and electrical layouts, and an itemised BOQ naming every brand and rate. Sign this and your price is locked.
A dedicated supervisor on site, weekly written progress reports with photos, and three formal quality inspections — after civil, after joinery installation and before painting.
Deep clean, styling, a joint snag walk, all warranty documents and appliance manuals handed over, and a 60-day check-in call. Then a 10-year carcass warranty stands behind the joinery.
No vague “design work”. Each stage produces documents you own and can build from, with us or without us.
You never pay for work that hasn't happened. Each release is triggered by a milestone you can see on site or in your inbox.
Bank transfer, UPI or cheque. 0% consumer EMI available on selected brands. Model your monthly outflow →
Two full revision rounds are included at 3D stage as standard, and in practice we keep refining until you are happy — we have never charged a client for a third round. Changes requested after the BOQ is signed are issued as written variation orders so cost impact is visible before work proceeds.
It gets reported to you in the weekly report, not discovered at handover. If a material fails inspection it is replaced at our cost. If a site condition forces a design change — a hidden beam, an unexpected shaft — we bring you two solutions and a cost comparison within 48 hours.
For renovations, usually yes. We phase the programme so at least one bedroom and one bathroom stay usable, seal off active zones with dust barriers, and schedule the loudest work into agreed windows. Full turnkey fit-outs go faster in a vacant flat, so we will tell you honestly which makes more sense for your project.
Share your floor plan and budget. Within 48 hours you'll have a written scope, an indicative BOQ and a realistic timeline — no obligation, no sales pressure.